Jx2 Productions • Our Work

Confidential Global Biotech Annual Meeting — TWA Hotel at JFK Airport

A New York production site within an interconnected international annual meeting, supporting live handoffs, cross-site interaction, and a compressed overnight build.

ClientConfidential global biotech company
VenueTWA Hotel • JFK Airport • New York
Global FormatLinked international locations
Local Build WindowLate-night load-in and next-day integration

The production challenge

Build a global-conference site overnight — and make it behave like one room.

The TWA Hotel served as the New York location for a confidential international annual meeting, connected to other event sites through a central production hub. Advance preparations and a compressed overnight build required carefully sequenced local production and global coordination.

Following advance venue preparations, the team carried out a late-night load-in, build, and systems-integration sequence ahead of next-day technical check-ins and rehearsals.

The execution was the result of months of technical planning, multiple site visits, equipment staging, detailed sequencing, and rotating crews designed around the compressed overnight production window.

Global interaction

Live handoffs between five locations.

The linked event locations were not independent broadcasts. They were interconnected and interactive, with multiple channels of intercom, video, and audio supporting live handoffs between locations.

That communications architecture allowed each site to present to, interact with, and respond to the others as part of one coordinated global program.

Overnight execution

Overnight build, systems integration, and global check-ins.

Late night

Load-in and the overnight production build begin after advance preparations.

Overnight

Rotating crews execute the preplanned load-in, build, systems integration, testing, and global communications workflow.

Next day

Technical check-ins, rehearsals, and coordination with the global production hub.

Multi-site intercomGlobal video linksMulti-channel audioLive handoffsOvernight buildRotating crews

Audio design

Discreet audio, clear sightlines.

The audio system was designed to cover the room without visually competing with the clean stage and backdrop. Rather than placing large loudspeakers where they would interrupt the sightlines, Jx2 distributed the system around the architecture and production truss.

Fulcrum Acoustic RX Series loudspeakers were used as discreet front fills, while LD Systems CURV 500 Series loudspeakers served as the primary flown system. The CURV arrays were placed strategically on the truss to provide overhead coverage while preserving the visual design.

See more of Jx2’s Audio & Video Production capabilities.

Front Fill

Fulcrum Acoustic RX Series loudspeakers provided compact, discreet coverage close to the stage.

Flown Mains

LD Systems CURV 500 Series arrays were flown from the production truss in strategic positions for overhead room coverage.

Production planning

Months of preparation for one compressed night.

Multiple site visits

The venue and production plan were reviewed repeatedly in advance so access, placement, infrastructure, and timing could be resolved before the overnight build.

Staged equipment

Equipment and workflow were staged around the overnight sequence so departments could build efficiently inside the restricted window.

Rotating crews

Crew rotation and sequencing were part of the plan, allowing the site to progress from dock arrival through system testing to show-ready status before dawn.

TWA Hotel production environment

From overnight build to a globally connected show site.

Planning a globally connected conference?

Jx2 can help coordinate the production design, site planning, show-site build, intercom, video, audio, and live handoff workflow required to make distributed locations operate as one event.