Jx2 Productions • Our Work

Confidential Global Biotech Annual Meeting — TWA Hotel at JFK Airport

One of five interconnected worldwide sites, engineered for live handoffs, cross-site interaction, and an overnight New York production build with no technical day.

ClientConfidential global biotech company
VenueTWA Hotel • JFK Airport • New York
Global Format1 of 5 worldwide sites
Local Build Window12:00 AM dock arrival → 5:30 AM show-ready

The production challenge

Build a global-conference site overnight — and make it behave like one room.

The New York event was one of five interconnected sites in an annual global meeting for a confidential global biotech company. Unlike the other locations, the TWA Hotel site did not have a technical day before show day.

Trucks arrived at the loading dock at midnight. The site had to be fully built, tested, integrated into the global conference system, and show-ready by 5:30 AM.

The execution was the result of months of technical planning, multiple site visits, equipment staging, detailed sequencing, and rotating crews designed around the compressed overnight production window.

Global interaction

Live handoffs between five locations.

The five sites were not independent broadcasts. They were interconnected and interactive, with multiple channels of intercom, video, and audio supporting live handoffs between locations.

That communications architecture allowed each site to present to, interact with, and respond to the others as part of one coordinated global program.

Overnight execution

Five and a half hours from dock arrival to show-ready.

12:00 AM

Trucks on the TWA Hotel loading dock and overnight production build begins.

Overnight

Rotating crews execute the preplanned load-in, build, systems integration, testing, and global communications workflow.

5:30 AM

New York site show-ready for the annual global meeting.

Multi-site intercomGlobal video linksMulti-channel audioLive handoffsOvernight buildRotating crews

Audio design

Discreet audio, clear sightlines.

The audio system was designed to cover the room without visually competing with the clean stage and backdrop. Rather than placing large loudspeakers where they would interrupt the sightlines, Jx2 distributed the system around the architecture and production truss.

Fulcrum Acoustic RX Series loudspeakers were used as discreet front fills, while LD Systems CURV 500 Series loudspeakers served as the primary flown system. The CURV arrays were placed strategically on the truss to provide overhead coverage while preserving the visual design.

See more of Jx2’s Audio & Video Production capabilities.

Front Fill

Fulcrum Acoustic RX Series loudspeakers provided compact, discreet coverage close to the stage.

Flown Mains

LD Systems CURV 500 Series arrays were flown from the production truss in strategic positions for overhead room coverage.

Production planning

Months of preparation for one compressed night.

Multiple site visits

The venue and production plan were reviewed repeatedly in advance so access, placement, infrastructure, and timing could be resolved before the overnight build.

Staged equipment

Equipment and workflow were staged around the overnight sequence so departments could build efficiently inside the restricted window.

Rotating crews

Crew rotation and sequencing were part of the plan, allowing the site to progress from dock arrival through system testing to show-ready status before dawn.

TWA Hotel production environment

From overnight build to a globally connected show site.

Planning a globally connected conference?

Jx2 can help coordinate the production design, site planning, show-site build, intercom, video, audio, and live handoff workflow required to make distributed locations operate as one event.